The recommended tools (unless otherwise stated) needed to install a dvLED Display is as shown below:
- Self-leveling laser level
- Stud sensor/finder - multi-depth/material
- (2) 8’ ladder
- Anti-static gloves (required)
- 3/8” hammer drill/driver
- ¼” impact driver
- Pilot point drill bit set for metal
- Metric ball-end hex key set
- Impact-ready bit set – Phillips and slotted #2 and #3
- Impact-ready nut driver set ¼” to ½”
- 4-vial torpedo levels – 12” and 2’ length
- Steel step drill bit
- Toggler drywall anchors – 3/16” diameter
- Tapcon concrete anchors – ¼” drive x 1 ¾” or longer pending wall substrate
- Steel lag screw – 5/16th drive x 1 ¾” or longer pending wall substrate
- Shop vacuum
- Moving blankets/pop-up work tables
- Convertible hand truck/dolly
- Pen/pencil/Sharpie
- 25’ steel magnetic tape measure